Duja Tower Shoring & Piling Works (Dubai / United Arab Emirates) | |
Client | H.E. Nasser Abdulla Hussain Lootah |
Project Management | ZAS / PSE |
The project is at Sheikh Zayed Road in Dubai, UAE. The shoring is Diaphragm Wall along the plot limit for 180 linear meters with 3 levels ground anchors to support 15 meters of excavation. There are 227 numbers of cast-in-situ bored piles under the foundation of the building. |
Duja Tower Shoring & Piling Works (Dubai / United Arab Emirates) | |
Client | H.E. Nasser Abdulla Hussain Lootah |
Project Management | ZAS / PSE |
The project is at Sheikh Zayed Road in Dubai, UAE. The shoring is Diaphragm Wall along the plot limit for 180 linear meters with 3 levels ground anchors to support 15 meters of excavation. There are 227 numbers of cast-in-situ bored piles under the foundation of the building. |
Duja Tower Shoring & Piling Works (Dubai / United Arab Emirates) | |
Client | H.E. Nasser Abdulla Hussain Lootah |
Project Management | ZAS / PSE |
The project is at Sheikh Zayed Road in Dubai, UAE. The shoring is Diaphragm Wall along the plot limit for 180 linear meters with 3 levels ground anchors to support 15 meters of excavation. There are 227 numbers of cast-in-situ bored piles under the foundation of the building. |
Duja Tower Shoring & Piling Works (Dubai / United Arab Emirates) | |
Client | H.E. Nasser Abdulla Hussain Lootah |
Project Management | ZAS / PSE |
The project is at Sheikh Zayed Road in Dubai, UAE. The shoring is Diaphragm Wall along the plot limit for 180 linear meters with 3 levels ground anchors to support 15 meters of excavation. There are 227 numbers of cast-in-situ bored piles under the foundation of the building. |
Zetas is active and an internationally recognized brand name in foundation engineering and contracting having operations in ten (10) different countries in Central Asia and Middle East including Turkey, as well as being a part of global network of geotechnical resources and expertise.