Baku By-Pass Road Shoring Works (Baku / Azerbaijan) | |
Client | Makyolcopri A.S. |
Shoring system composed of permanent soil nailing and shotcrete for the road excavations reaching upto maximum 30 m depth along Baku By-pass road project were constructed. |
Baku By-Pass Road Shoring Works (Baku / Azerbaijan) | |
Client | Makyolcopri A.S. |
Shoring system composed of permanent soil nailing and shotcrete for the road excavations reaching upto maximum 30 m depth along Baku By-pass road project were constructed. |
Baku By-Pass Road Shoring Works (Baku / Azerbaijan) | |
Client | Makyolcopri A.S. |
Shoring system composed of permanent soil nailing and shotcrete for the road excavations reaching upto maximum 30 m depth along Baku By-pass road project were constructed. |
Baku By-Pass Road Shoring Works (Baku / Azerbaijan) | |
Client | Makyolcopri A.S. |
Shoring system composed of permanent soil nailing and shotcrete for the road excavations reaching upto maximum 30 m depth along Baku By-pass road project were constructed. |
Zetas is active and an internationally recognized brand name in foundation engineering and contracting having operations in ten (10) different countries in Central Asia and Middle East including Turkey, as well as being a part of global network of geotechnical resources and expertise.