Degirmendere Dam Cut-Off Slurry Wall (Amasya / Turkey) | |
Client | State Water Works |
Main Contractor | Karaca İnşaat |
Construction of apprximately 5,500 m2 of slurry walls with thickness t=100cm for an irrigation dam in Amasya, Turkey. Pumping and permeability tests in upstream and downstream side of the wall proved to be slurry cut-off successful. |
Degirmendere Dam Cut-Off Slurry Wall (Amasya / Turkey) | |
Client | State Water Works |
Main Contractor | Karaca İnşaat |
Construction of apprximately 5,500 m2 of slurry walls with thickness t=100cm for an irrigation dam in Amasya, Turkey. Pumping and permeability tests in upstream and downstream side of the wall proved to be slurry cut-off successful. |
Degirmendere Dam Cut-Off Slurry Wall (Amasya / Turkey) | |
Client | State Water Works |
Main Contractor | Karaca İnşaat |
Construction of apprximately 5,500 m2 of slurry walls with thickness t=100cm for an irrigation dam in Amasya, Turkey. Pumping and permeability tests in upstream and downstream side of the wall proved to be slurry cut-off successful. |
Degirmendere Dam Cut-Off Slurry Wall (Amasya / Turkey) | |
Client | State Water Works |
Main Contractor | Karaca İnşaat |
Construction of apprximately 5,500 m2 of slurry walls with thickness t=100cm for an irrigation dam in Amasya, Turkey. Pumping and permeability tests in upstream and downstream side of the wall proved to be slurry cut-off successful. |
Zetas is active and an internationally recognized brand name in foundation engineering and contracting having operations in ten (10) different countries in Central Asia and Middle East including Turkey, as well as being a part of global network of geotechnical resources and expertise.